From June 11th to 21th, 2014, Egypt IPR representatives visit TEFICO for Acceptance of 350HP workover rig. During this visit , IPR Group witness a series of tests which includes load test of mast, hydraulic winch, hydraulic cathead,Raising&lowering of the mast, road test etc.
After the inspection, IPR and TFICO have a further discussion about modification and additional equipment of 750HP drillng&workover rig.TEFICO guarantees that they will try their best to provide best of best products to IPR. And leaders of both sides also express their future coorperation intension that they will continually work together to open Egypt market of drilling rigs.
Picture 1
Picture 2
|