Position:

Home >> News


Egypt IPR Team visit TEFICO for acceptance of 350HP workover rig

[ The author:admin | time:2014-07-01 | browse::1488number ]

 

   From June 11th to 21th, 2014, Egypt IPR representatives visit TEFICO for Acceptance of 350HP workover rig. During this visit , IPR Group witness a series of  tests which includes load test of mast, hydraulic winch, hydraulic cathead,Raising&lowering of the mast, road test etc.

   After the inspection, IPR and TFICO have a further discussion about modification and additional equipment of 750HP drillng&workover rig.TEFICO guarantees that they will try their  best to provide best of best products to IPR. And  leaders of both sides also express their future coorperation  intension that they will continually work together to open  Egypt market of  drilling rigs.

                                               Picture 1

     

                                                               Picture 2

 

 

                                                               

Shaanxi TEFICO Petroleum Mechanical & Electric New Technology Co.,Ltd. 
86 0917 6269915 86 0917 6269906 Add:Gaoxin 18th Road, High-tech Zone, Baoji, Shaanxi, China Post code:721013 Fax:0917-6269906 E-mail:info@teficopetro.com